Daily Archives: November 2, 2022

Cllr McCarthy: Consultation open on safe intersection proposals at Maryborough Woods and Berkeley, Douglas, 2 November 2022

Independent Cllr Kieran McCarthy has welcomed Cork City Council’s proposed junction safety works on Carrigaline Road between lower Maryborough Woods and Berkley estate, and calls on local people with issues or concerns to engage with the consultation process.

Cork City Council proposes to provide a shared cycle track on the western side of the distributor road within Berkeley to the junction with Carrigaline Road and through to the distributor road within Maryborough Woods. This shared space will provide a safe route for cyclists from Ballybrack Walkway Phase 3 and the proposed Ballybrack Walkway Phase 4 through Berkeley to the Carrigaline Road and into Maryborough Woods.

The main elements of the proposed works are; Provision of a 3m shared cycle facility connecting Ballybrack Phase 3 in Berkeley to Maryborough Woods. The length of this shared facility is approximately 160m; Footpaths in Berkeley and Carrigaline Road adjacent the scheme will be upgraded to 2m; There are new proposed zebra crossings to facilitate a safe crossing point for both pedestrians and cyclists while also slowing vehicles for added safety; Modification to kerbs and road widths to accommodate proposed cycling infrastructure; And new road marking and signage.

More details here: Active Travel Improvement Works from Maryborough Woods, Douglas to Berkeley, Douglas | Cork City Council’s Online Consultation Portal

Cllr McCarthy noted: “There is quite a number of small footpath widths in this area – so making the immediate area pedestrian friendly and creating pedestrian crossings are welcome. On any given day, the traffic moves at speed through the area. With the opening of the new school shortly nearby, there will be much more pedestrians on local footpaths. It is also not envisaged to take any treeline. It is important though that local residents are aware of the proposals”.  

Any observations in relation to this proposal should be made electronically through https://consult.corkcity.ie or forwarded in an envelope marked “Active Travel Improvement Works Maryborough Woods to Berkeley, Douglas” to Senior Engineer, Infrastructure Development, City Hall, Anglesea Street, Cork. Final date for submissions is 5pm on Monday, 28 November 2022.